Energy & Natural Resources Law in Turkey for Foreign Investors

If you are a foreign investor, developer or EPC contractor entering Turkey's energy market, Lexin Legal guides you through licensing, project contracts and regulatory compliance across electricity, renewables, oil, gas and mining. We act for foreign companies under Turkish law — handling EPDK and MAPEG filings, structuring the entity that will hold your licence, and representing you in disputes. You can instruct us remotely, from your first scoping call through to grid connection and operation.

Governing lawElektrik Piyasası Kanunu No. 6446, Türk Petrol Kanunu No. 6491, Maden Kanunu No. 3213
RegulatorEPDK (energy markets) and MAPEG (petroleum and mining)
Renewable frameworkYEKDEM support and YEKA capacity tenders under Law No. 5346
Foreign investorsFull market access; handled remotely via notarised, apostilled power of attorney

Who this service is for

Turkey sits between the energy markets of Europe, the Caucasus and the Middle East, and it imports most of its primary energy — which is exactly why it keeps opening capacity to private and foreign capital. We act for the foreign businesses that want a share of it:

  • Independent power producers and developers building solar, wind, hydro, geothermal or thermal plants.
  • EPC and O&M contractors delivering or operating energy projects under Turkish-law contracts.
  • Oil and gas companies seeking upstream exploration or operation licences, or entering the downstream gas market.
  • Mining investors acquiring or applying for exploration and operation licences.
  • Funds, strategic acquirers and lenders buying into, or financing, existing licensed projects.

Whether you are entering Turkey for the first time or restructuring a portfolio you already hold, the legal questions are the same: who can hold the licence, how the regulator decides, and what contracts protect your investment. For the bigger picture, see our guide for foreign investors establishing a business in Turkey.

Bearded man in a red jacket holds a tablet on a gravel track between rows of solar panels and wind turbines on dusk hills
An energy or mining project in Türkiye involves more than one authority, and newcomers rarely meet them in the order they expected. This page sets out those stages in sequence, and the points at which a foreign developer usually wants Turkish counsel alongside.

Which track does your project fall under?

Most grid-connected plants follow the two-step path under the Electricity Market Law No. 6446: a pre-licence (önlisans) giving you a defined window to secure land rights, grid connection, environmental approval and finance, which then converts into a generation licence (lisans) authorising construction and operation. Each preparatory obligation carries its own deadline, and a missed milestone can cost you the pre-licence and the security behind it.
Generation below the statutory capacity threshold — including many rooftop and behind-the-meter solar systems — can often proceed under the unlicensed generation regime rather than the full EPDK licence process. The threshold is set by regulation, so it has to be confirmed for your specific plant. Choosing the right track at the outset shapes the whole timeline.
Upstream exploration and operation sit under the Petroleum Law No. 6491 and are administered by MAPEG, covering licence rights and obligations, the state's share of production and the rules for transferring or surrendering rights. Downstream import, wholesale, distribution, storage and supply sit under the Natural Gas Market Law No. 4646, with EPDK issuing those market licences. If your project spans both, the licences and entities need structuring so the two compliance streams do not trip over each other.
Mining rights are granted under the Mining Law No. 3213 as exploration licences (arama ruhsatı) and operation licences (işletme ruhsatı), classified by mineral group and administered by MAPEG. Holders owe the state a royalty (Devlet hakkı) and must keep up fee payments, periodic reporting and activity obligations to keep the licence alive. Royalty percentages, fees and licence terms have changed across successive amendments, so current figures need confirming before you model the project.

How Turkey regulates energy and natural resources

Turkish energy law is built around two regulators and a set of sector statutes. Knowing which body decides your matter saves time and avoids filings landing on the wrong desk.

The law: The Electricity Market Law No. 6446 governs the electricity market and licensing; the Petroleum Law No. 6491 governs upstream oil and gas; the Natural Gas Market Law No. 4646 governs the downstream gas market; the Mining Law No. 3213 governs mining rights; and the Renewable Energy Resources Law No. 5346 sets the renewable support framework.

EPDK (Enerji Piyasası Düzenleme Kurumu, the Energy Market Regulatory Authority) is the regulator for electricity, natural gas, LPG and petroleum markets — it issues, amends and revokes market licences and supervises tariffs. MAPEG (Maden ve Petrol İşleri Genel Müdürlüğü) administers petroleum exploration and operation rights and mining licences. Energy and mining regulatory disputes are heard before the administrative courts and, on appeal, the Danıştay (Council of State), whose 8th Chamber regularly decides EPDK licensing cases.

For a wider read on where the sector is heading, see our overview of Turkish energy and natural resources law.

Electricity and renewables: pre-licence and licence under Law No. 6446

Most grid-connected generation in Turkey runs on a two-step licensing path under the Electricity Market Law No. 6446. First you obtain a pre-licence (önlisans), which gives you a defined window to complete the preparatory steps — securing land rights, the grid connection agreement, environmental approvals and project finance. Once those are done, the pre-licence converts into a generation licence (lisans), which authorises construction and operation.

Smaller and self-consumption plants — particularly rooftop and behind-the-meter solar below the statutory capacity threshold — can often proceed under the unlicensed generation regime, avoiding the full licence process. Choosing the right track at the outset shapes your whole timeline.

Watch the deadline: A pre-licence carries strict time limits for completing each preparatory obligation. Missing a milestone can lead EPDK to cancel the pre-licence and draw on your security. Confirm the current capacity thresholds and pre-licence durations before you commit — these are set by regulation and change.

The activities themselves — generation, transmission, distribution, wholesale, retail supply and trading — each require their own licence type. We map your business model to the correct licence and prepare the EPDK application so it is not bounced for missing documents.

Renewable energy: YEKDEM support and YEKA capacity tenders

Turkey supports renewables through two distinct mechanisms, and investors routinely confuse them.

YEKDEM (Yenilenebilir Enerji Kaynaklarını Destekleme Mekanizması) is the renewable support scheme under the Renewable Energy Resources Law No. 5346 and the Electricity Market Law. It provides a guaranteed purchase price for eligible renewable generation for a defined support period, with a domestic-equipment top-up for locally manufactured components.

YEKA (Yenilenebilir Enerji Kaynak Alanları) is a competitive tender route for large-scale capacity, where the state allocates designated zones or quotas and the winning bid sets the price. YEKA projects typically carry local-content and sometimes local-manufacturing commitments.

Watch the deadline: YEKDEM tariff figures, ceiling prices, the currency they are paid in, and the support duration have all been changed repeatedly by Presidential Decree. Do not rely on any published price without checking the version in force for your commissioning date — we verify the current numbers for each project rather than quoting from memory.
FeatureYEKDEMYEKA
TypeStanding support tariffCompetitive capacity tender
PriceSet by the support schemeSet by the winning bid
ScaleProject by projectLarge allocated zones / quotas
Local contentOptional top-up incentiveOften a binding condition

Oil and gas: upstream licensing and the downstream market

Upstream oil and gas is governed by the Petroleum Law No. 6491, administered through MAPEG. The law sets out the regime for exploration and operation licences, the rights and obligations of the licence holder, the state's share of production, and the rules for transferring and surrendering rights. Securing acreage, complying with work programmes and managing the state interest are where most upstream disputes arise.

Downstream, the Natural Gas Market Law No. 4646 governs import, wholesale, distribution, storage and supply, with EPDK issuing the relevant market licences. Importers, distributors and suppliers each operate under their own licence and tariff rules.

Tip: Upstream and downstream sit under different regulators and different statutes. If your project spans both — say, a producer that also wants to market gas — we structure the licences and the corporate entities so the two streams don't trip over each other's compliance obligations.

For a deeper treatment of the upstream regime, see our Turkish oil and gas licensing guide.

Mining rights: exploration and operation licences under Law No. 3213

Mining is governed by the Mining Law No. 3213, the country's framework statute since 1985 and amended many times since. Rights are granted as exploration licences (arama ruhsatı) and operation licences (işletme ruhsatı), classified by mineral group, and administered by MAPEG. Holders owe the state a royalty (Devlet hakkı) and must meet activity, reporting and environmental conditions to keep the licence alive.

Watch the deadline: Mining licences depend on timely fee payments, periodic reporting and meeting activity obligations. A missed payment or expired guarantee can trigger cancellation. Royalty percentages, fees and licence terms have changed across successive amendments — confirm the current figures for your mineral group before you model the project.

For foreign investors, the practical issues are the same as elsewhere in the sector: the entity that holds the licence, the security interests a lender can take over it, and the diligence needed before acquiring an existing licence rather than applying afresh.

A rock drill core, a dark blue solar cell and a lump of black ore on a pale stone slab ringed by coiled red cable

Project development, EPC, PPAs and power-purchase arrangements

A licence is only the start. The economics of an energy project live in its contracts, and these are usually Turkish-law agreements that need to dovetail with the regulatory regime.

  • Power purchase agreements (PPAs) — bilateral offtake with a corporate buyer or supplier, or participation in the support scheme.
  • EPC and O&M contracts — engineering, procurement and construction, plus long-term operation and maintenance, with the right liability, delay and performance terms.
  • Grid connection and land rights — connection agreements with the network operator and secure rights over the project site.
  • Supply, equipment and interconnection agreements — turbines, panels, fuel supply and balancing arrangements.

We draft and negotiate these as power-purchase and EPC contracts built around your project, and we help secure the underlying land acquisition and site rights for the project, including usufruct and easements where outright purchase is not available.

A navy-gloved hand reaches into a scale model of a power plant with white stacks, storage tanks and a switchyard on a red base
Common belief

A published YEKDEM tariff is a figure you can build a business plan on.

In fact

YEKDEM tariff figures, ceiling prices, the currency they are paid in and the support duration have all been changed repeatedly by Presidential Decree. A plan built on last year's tariff can be wrong by the time you commission, so what counts is the version in force for your commissioning date.

Common belief

Buying a company that already holds a licence is the clean shortcut.

In fact

Acquiring a company to get its licence means inheriting its compliance history, penalties and disputes. The licence itself needs diligence, not just the shares — alongside site and land rights, grid connection capacity and any inherited proceedings.

Common belief

Once the licence is in hand, the rest is administrative detail.

In fact

Connection capacity and site rights are often the real bottleneck rather than the licence, and a gap in the ÇED decision, zoning or construction permits can stall a project even where the licence is in order. Weak EPC, PPA or O&M terms surface exactly when a project is in trouble.

Foreign-investor mechanics: structure, FDI, PoA and remote handling

Turkey treats foreign and domestic energy investors equally under its foreign direct investment rules — there is no general foreign-ownership cap on energy or mining companies, and profits and capital can be repatriated. What matters is getting the holding structure right.

Most licences must be held by a Turkish-registered company, so the first step is usually to set up the Turkish company that will hold the licence — typically a limited or joint-stock company sized to your project and tax position. We then complete the licensing in that entity's name.

Tip: You do not need to fly in. With a notarised, apostilled power of attorney, we can form the company, file EPDK or MAPEG applications, sign before notaries and represent you throughout. Documents executed abroad need an apostille under the Hague Convention (or consular legalisation for non-member states) plus a sworn Turkish translation.

If your entry is by acquiring an existing licensed company rather than building new, that becomes a corporate transaction — see how we handle merger control and competition clearance where deal size triggers a filing.

Permits, grid connection and environmental (ÇED) approvals

Between pre-licence and operation sits a stack of permits, and a gap in any one of them can stall the whole project. The main ones are:

  • Environmental Impact Assessment (ÇED) — a positive ÇED decision, or a confirmed exemption, is a precondition for many projects.
  • Grid connection agreement with the transmission or distribution operator, plus an allocated connection capacity.
  • Zoning, construction and operation permits from the relevant municipality or ministry.
  • Land and site rights — ownership, lease, usufruct or, on treasury or forest land, a specific allocation.
Watch the deadline: ÇED screening thresholds and procedures are set by regulation and updated periodically. Whether your project needs a full ÇED, a project-description file, or qualifies for exemption depends on its type and capacity — confirm the current rules for your specific plant before you build your timeline around them.
A red switchgear cabin behind red railings on a concrete pad, with a lattice pylon and an open-air substation in dry hills

EPDK compliance, penalties and licence disputes before the Danıştay

Once you hold a licence, the regulator stays in the picture. EPDK supervises tariffs, reporting, market conduct and licence conditions, and it can impose administrative fines, suspend activity or revoke a licence for breach. Because these are administrative acts, they are challenged before the administrative courts — and EPDK licensing and penalty disputes reach the Danıştay, whose 8th Chamber continues to decide electricity-market cases through to the most recent terms.

Watch the deadline: A challenge to an EPDK decision generally must be filed within the statutory administrative-litigation period running from notification of the act. Miss that window and the decision becomes final regardless of its merits. Confirm the exact period and any mandatory pre-litigation objection step as soon as a decision lands.

We handle the full arc — responding to EPDK information requests and audits, contesting penalties, and pursuing annulment actions. Where a project dispute is contractual rather than regulatory, we also act in energy and construction arbitration, including international arbitration where the contract provides for it.

Common mistakes foreign developers make

The same avoidable problems recur, and most are cheaper to prevent than to litigate:

  • Modelling on outdated support figures. YEKDEM prices, the payment currency and the support period have changed repeatedly — a business plan built on last year's tariff can be wrong by the time you commission.
  • Letting pre-licence milestones slip. Each preparatory obligation has its own deadline; missing one can forfeit the pre-licence and the security behind it.
  • Buying a licence without diligence. Acquiring a company to get its licence means inheriting its compliance history, penalties and disputes. We diligence the licence, not just the shares.
  • Underestimating land and grid steps. Connection capacity and site rights are often the real bottleneck, not the licence itself.
  • Treating Turkish-law contracts as a formality. Weak EPC, PPA or O&M terms surface exactly when a project is in trouble.

Why instruct a Turkish energy lawyer

Energy is one of Turkey's most heavily regulated and most frequently amended sectors. Tariffs move by Presidential Decree, licensing rules sit in secondary regulation that changes between projects, and the regulator's practice shifts with caselaw. A Turkish lawyer reads the statutes, the regulations and the Danıştay decisions in the original and applies the version in force today — not a translated summary from two reforms ago.

Lexin Legal works in English for foreign clients, coordinates with your technical and financial advisers, and keeps the legal workstream aligned with your build schedule. We tell you plainly what the law requires, where the risks sit, and what we will and will not put in writing — and we keep to the Turkish bar's professional rules throughout.

Send us a short description of your project — technology, target capacity, location and stage — and we will tell you which licences and approvals apply, the realistic timeline, and what we can begin on the strength of a power of attorney. From there we move into structuring, due diligence and filing. You can reach us through the consultation card on this page, and the whole engagement can run remotely.

6446LAW NO.
Electricity Market Law (Elektrik Piyasası Kanunu)

Governs generation, transmission, distribution, supply and trading in the electricity market, together with the EPDK pre-licence and licence regime.

6491LAW NO.
Petroleum Law (Türk Petrol Kanunu)

Governs upstream oil and gas — exploration and operation licences, the licence holder's rights and obligations, the state's share of production and transfers of rights — administered through MAPEG.

3213LAW NO.
Mining Law (Maden Kanunu)

The framework statute for mining rights since 1985, under which exploration and operation licences are granted by mineral group and administered by MAPEG, with a state royalty and activity, reporting and environmental conditions attached.

How we take your energy project forward

Scoping call and project assessment

We start with your project type, capacity, location and stage, then identify the statutes, licences and regulators that apply and flag the main legal risks before you spend on the ground.

Structuring entry and the licence-holding entity

We design the holding structure and form or adapt the Turkish company that will hold the licence, sized to your project, tax position and financing plan.

Due diligence on licences, land and grid rights

Whether you are building new or acquiring, we diligence the licence status, site and land rights, grid connection capacity and any inherited penalties or disputes.

Licence application and EPDK filings

We prepare and lodge the pre-licence, licence or MAPEG applications, assemble the supporting documents and respond to regulator queries so filings are not returned incomplete.

Negotiating PPAs, EPC and project contracts

We draft and negotiate the power purchase, EPC, O&M, grid connection and supply agreements that carry the project's economics and allocate risk.

Securing permits and ongoing compliance

We coordinate ÇED, zoning and connection approvals and keep you compliant with EPDK reporting, tariff and licence-condition obligations once operating.

Representation in disputes and enforcement

If a penalty, revocation or contract dispute arises, we act before the administrative courts and the Danıştay, or in arbitration where the contract provides for it.

What to prepare before your first call

The scoping stage moves faster when the basics of the project are already on paper. Gather the following:

Frequently asked questions

Can a foreign company own an energy or mining project in Turkey?

Yes. Turkey's foreign direct investment rules treat foreign and domestic investors equally in the energy and mining sectors, with no general foreign-ownership cap, and capital and profits can be repatriated. In practice the licence is usually held by a Turkish-registered company that the foreign investor owns.

Which law governs the electricity market in Turkey?

The Electricity Market Law No. 6446 governs generation, transmission, distribution, supply and trading, and the EPDK licensing regime. It is the framework statute the regulator and the courts apply to electricity-market disputes.

What is the difference between a pre-licence and a licence?

A pre-licence (önlisans) gives you a defined period to complete preparatory steps — land, grid connection, environmental approval and finance. Once those are met it converts into a generation licence (lisans) authorising construction and operation. Each pre-licence obligation carries its own deadline.

Do small solar or rooftop projects need an EPDK licence?

Generation below the statutory capacity threshold, including many rooftop and self-consumption solar systems, can often proceed under the unlicensed generation regime instead of the full licence process. The current threshold is set by regulation, so we confirm it for your specific plant.

What is YEKDEM and how does it support renewables?

YEKDEM is the renewable support mechanism under the Renewable Energy Resources Law No. 5346 and the Electricity Market Law. It provides a guaranteed purchase price for eligible renewable generation for a set period, with a top-up for domestically manufactured equipment. The tariff figures and payment currency are changed by Presidential Decree and must be checked for your commissioning date.

How is YEKA different from YEKDEM?

YEKDEM is a standing support tariff available project by project. YEKA is a competitive tender for large-scale capacity, where the state allocates designated zones or quotas and the winning bid sets the price, usually with local-content or local-manufacturing commitments.

Which law covers oil and gas in Turkey?

Upstream exploration and operation are governed by the Petroleum Law No. 6491, administered through MAPEG. The downstream natural gas market — import, distribution, storage and supply — is governed by the Natural Gas Market Law No. 4646, with EPDK issuing the market licences.

How are mining licences obtained?

Under the Mining Law No. 3213, rights are granted as exploration licences (arama ruhsatı) and operation licences (işletme ruhsatı), classified by mineral group and administered by MAPEG. Holders owe a state royalty and must meet fee, reporting and activity conditions to keep the licence in force.

Can you handle the whole process if I cannot travel to Turkey?

Yes. With a notarised and apostilled power of attorney we can form the company, file EPDK and MAPEG applications, sign before notaries and represent you throughout. Documents executed abroad need an apostille (or consular legalisation) and a sworn Turkish translation.

What permits are needed besides the licence?

Most projects also need an environmental decision (ÇED positive or exemption), a grid connection agreement with allocated capacity, zoning and construction permits, and secured site rights. A gap in any of these can stall the project even where the licence is in order.

What happens if EPDK imposes a penalty or revokes my licence?

EPDK decisions are administrative acts and are challenged before the administrative courts, with appeals reaching the Danıştay. There is a statutory deadline to file from notification of the decision, after which it becomes final, so the time limit must be confirmed and met as soon as a decision lands.

Do I have to set up a Turkish company, or can I hold the licence personally?

In practice most energy and mining licences are held by a Turkish-registered company rather than an individual. We typically form a limited or joint-stock company to hold the licence, structured for your project, financing and tax position.

Can a lender take security over an energy licence or project?

Project finance structures commonly take security over the project company's shares, receivables and assets, and over rights connected to the licence to the extent the regulatory regime permits. We structure the security package and the consents the regulator and counterparties require.

How long does it take to license an energy project in Turkey?

Timelines vary widely by technology, capacity and the licensing track, and depend on grid connection, environmental approval and land rights as much as on the regulator. We give a realistic project-specific timeline at the scoping stage rather than a generic figure.

Do you also handle disputes and arbitration in energy projects?

Yes. We act in regulatory disputes before the administrative courts and the Danıştay, and in contractual disputes through litigation or arbitration, including international arbitration where the EPC or PPA provides for it.

Let's begin

Speak to a Turkish lawyer who speaks your language.

Tell us your commercial, corporate or personal matter and get a clear, fixed-fee answer from a real Turkish lawyer — usually within one business day.

★★★★★ 4.9 from 60 Google reviews · Recognised on Mondaq, Clutch & Trustpilot
WhatsApp us
A real lawyer replies — usually within a day
WhatsAppEmailBook a consultation